Share your knowledge of this product with other customers...
Be the first to write a review
 |
Rubber Motor Mounts (EP-200, EP-100) {set of 4}
$89.02
|
 |
 |
Axial Fan Assembly (UHA-200,225,250)
|
 |
 |
Ignition Cable Assembly (R, 150B, CTH, CTH1, EG)
|
 |
 |
Vacuum/Flow Proving Switch {5 amps contact rating, 1.20"WC, silicone hose, barbed fitting, screws, VPS: wire normally open, FPS: wire normally closed} [Honeywell]
$140.35
|
 |
 |
Fuse (UltraVac® Relay Board) {7A}
$4.02
|
 |
 |
Thermostat Connection
$6.03
|
 |
 |
Ignition Control Module {DSI} (CGTH before 12/1/10) [Fenwal]
$514.40
|
 |
 |
Ignition Control Module {DSI} (CGTH after 12/1/10) [Fenwal]
$340.48
|
 |
 |
Control Board: LP Gas (CTH3-200)
|
 |
 |
 |
 |